Cost Of Community

Cost Of the Community

Projected community start-up cost:

Livestock:

1.200 Pigs @ $200 ea. Total $40K plus $10K for transport, Total $50k

(And we need 200 pig’s the cost would be $40,000.00 Plus will cost

about $10,000.00 for transport. So the chances of us getting from one

farm would be the slim chance and then long trip north. =$50,000.00.

 

2. Horses are about $1500 ea. about 100 horses = 150,000 + $50,000 for shipping and transport = $200,000.

3.20 Cows @ the current market price for milk cows is $2500 ea. 18

cows and 2 bulls @ $50K plus $10K for transport. =$60K

4.500 Brown laying hens and some roosters @ $20 ea. for 1-year-old

birds. $10K plus $1K for transport. = $11K

 

5.20 Lamas (to protect against predators) Cost each approximately

$250 for $5K in total. Cost of transport: $10K for a total of $15K

6.50 sheep @ $300.00 ea. Cost will be about $15K and about $5K for

transport = $20K

6.100 turkeys Still working on price for 1-month-old

Projected total cost for livestock: $356K

Tools

1.100 Cordless Electric 80 volt Chainsaws @ $500 ea. =$50K

2.50 CUSTOM DRAW KNIVES @$600 each for a set =$30K

3.100 Bear® Archery Escape Bow – Realtree XTRA® @ $930 ea.

=$93K

4.1200 Arrows for bows @ $7.50 ea.= $9K

5.600 arrowheads @$8.40 ea. =$5,040

6.100 fishing rods and reel @ $30 ea. =$3020.95

7. 3 portable lumber mills @ $4399.00 ea. which extra track and parts

come to about $22K http://woodlandmills.ca/product-
category/sawmills/?gclid=CPmw_P-p3tECFUeEfgodmB0LxA

8. 100 Wagan 3600 Watt Solar Power Inverter Generator

by Wagan$2,364.99 ea. = $236,499

TOTAL: $449K

Community members can supply cook stoves, BBQs, tents etc.

We are also going to need pickup truck in with 4×4 mode for getting in

and with large trailers.